Updates to the Transit Center Renovation Project Schedule – 4.2.2025

April 2, 2025

Due to weather, there will be a change in timing regarding the Transit Center renovation and transition to High St./MLK Blvd.
Roadway striping is not able to be replaced in the rain, causing a delay.

The updated schedule is posted below.

Transit Center Construction Schedule

DateWhere Will Buses Load?Customer ServiceTransit Center Restrooms, Waiting Areas, and Staff Areas
Friday 4/4/25Transit Center (Vine St.)Open at Transit Center windows until Noon, then available by phone until 6:00 pm. Call (859) 253-4636Open
Saturday 4/5/25Transit Center (Vine St.)Transit Center windows closed.
Available by phone only from 8:00 am – 4:00 pm.
Call (859) 253-4636
Open
Sunday 4/6/25Transit Center (Vine St.)ClosedOpen
Monday 4/7/25Transit Center (Vine St.)Transit Center windows closed.
Available at 200 W Loudon Ave. and by phone 6:00 am to 6:00 pm.
Call (859) 253-4636
Closed
Tuesday 4/8/25Transit Center (Vine St.)Transit Center windows closed.
Available at 200 W Loudon Ave. and by phone 6:00 am to 6:00 pm.
Call (859) 253-4636
Closed
Wednesday 4/9/25Transit Center (Vine St.)Transit Center windows closed.
Available at 200 W Loudon Ave. and by phone 6:00 am to 6:00 pm.
Call (859) 253-4636
Closed
Thursday 4/10/25High St. and MLK Blvd.Transit Center windows closed.
Available at 200 W Loudon Ave. and by phone 6:00 am to 6:00 pm.
Call (859) 253-4636
Closed